Earned value: knowing where you really stand before it is too late
You have spent 60% of the budget and used 60% of the programme — are you on track? Those two numbers cannot tell you. Earned value is the missing third.
Blog
What we have learned working with contractors across the region — on cost control, running the site, document control, and tools that hold up when the network drops.
You have spent 60% of the budget and used 60% of the programme — are you on track? Those two numbers cannot tell you. Earned value is the missing third.
Software that shows a “no connection” screen on a site with no coverage is a paper logbook with extra steps. Here is what being genuinely offline-first actually requires.
An unanswered RFI stops a whole work item on site. The difference between a firm that waits and a firm that manages the wait is a system for tracking response deadlines and escalating.
A paper timesheet usually gets filled in at the end of the week, from memory. Geofenced attendance turns it into a timestamped, located record — provided it is designed to work on a site with no coverage.
Most contractors price the BOQ once and never open it again until the first valuation. This guide covers how to make it the reference for progress and cost across the whole project.